Browsing 2011 Projects by Issue Date

DSpace/Manakin Repository

Browsing 2011 Projects by Issue Date

Sort by: Order: Results:

  • Shved, Olga; Shved, Anastasiya; Yang, Sida (Faculty of Applied Science and Engineering, University of Regina, 2011-04-02)
    The Fly Ash Pneumatic Cleaner removes fly ash from the plates and electrodes of an electrostatic precipitator which collects fly ash particles produced during the combustion of coal at SaskPower Boundary Dam in Estevan, ...
  • Lane, Jay; Cross, Nate; Godfrey, Mike; Padbury, Jordan (Faculty of Applied Science and Engineering, University of Regina, 2011-04-02)
    Designed to provide real-world, controlled-contour putting greens; this project uses elastic, spring-tensioned turf with pneumatic actuators. The 8'x15' green features four pods whose heights can be adjusted through an ...
  • Ruiters, Garret; Patterson, Casey; Shirif, Ahmed (Faculty of Applied Science and Engineering, University of Regina, 2011-04-02)
    An in-line conveyor component for rotating a 20 kg salt block by 90o has been designed for the Canadian Salt Company. The block must be re-oriented for subsequent downstream processing. This innovative addition is powered ...
  • DeBolt, Elliott; Jones, Derik; Ganne, Brandon (Faculty of Applied Science and Engineering, University of Regina, 2011-04-02)
    The Portable Regulator Station is designed as an emergency unit to bypass permanent regulator stations by connecting to the existing SaskEnergy piping network. The station will maintain normal gas distribution and flow ...
  • BIO SKI 
    Campbell, Stephanie; Sliva, Garret; Desnoyers-Stewart, John (Faculty of Applied Science and Engineering, University of Regina, 2011-04-02)
    The BIO SKI is a composite alpine ski, designed and manufactured using bio-derived material that reduces negative environmental impacts but maintains comparable ski performance. Natural flax fibres and a bio-derived epoxy ...
  • Arnstead, Keith; Fick, James; Schubach, Paul (Faculty of Applied Science and Engineering, University of Regina, 2011-04-02)
    The Snow Leopard Temporary Traction System provides the additional traction required when a vehicle becomes stuck in winter driving conditions. The track and frame assembly are mounted around and driven by the vehicle’s ...
  • Amundsen, Claire; Fellner, Brittany (Faculty of Applied Science and Engineering, University of Regina, 2011-04-02)
    A pilot study of a mid-scale composting system was developed, and laboratory and field tests were conducted to optimize the design. This hot composting system consists of several 3-bin turning units designed to manage ...
  • Zabolotnii, Elena (Faculty of Applied Science and Engineering, University of Regina, 2011-04-02)
    A four-step process to mitigate wildlife collisions on a provincial scale was developed and field-tested in the Chesterfield Bridge case study. The process was largely automated using original methodology and tested in the ...
  • Yang, Yongzhe; Zhao, Yao (Faculty of Applied Science and Engineering, University of Regina, 2011-04-02)
    This study proposes an innovative volume-based charging system for landfill sites, as opposed to traditional charging systems which are based solely on the weight of the waste. This should result in a fairer means of ...
  • Stephenson, Matthew; Grimard, Kyle (Faculty of Applied Science and Engineering, University of Regina, 2011-04-02)
    A modern roundabout has been identified as a possibility for the intersection of Highway No. 364 and Assiniboia Street in Balgonie, SK. The roundabout must accommodate the traffic volumes of the highway and the minor road, ...
  • Sidloski, Renée; Kendel, Derek (Faculty of Applied Science and Engineering, University of Regina, 2011-04-02)
    The study of salt contamination in the Wascana Creek Sub-basin is an integral part of a recommendation made by SWA in one of their source water protection plans for Saskatchewan. This study analyzes historical water quality ...
  • Zunti, Shaun; Amundson, Jeff (Faculty of Applied Science and Engineering, University of Regina, 2011-04-02)
    Constructed wetlands are man-made wetlands used to treat contaminated effluent from many different sources, including industrial waste, city sewage, and various other waste streams. The purpose of this project is to increase ...
  • Schneider, Stephen; Tan, Nigel (Faculty of Applied Science and Engineering, University of Regina, 2011-04-02)
    The Albert Park neighbourhood of Regina has experienced multiple flood events in the last 40 years. The existing drainage system and several alternative designs were modelled in EPA SWMM, a stormwater drainage software ...
  • Foulkes, Matthew; Trithardt, Sean (Faculty of Applied Science and Engineering, University of Regina, 2011-04-02)
    The purpose of this project is to investigate the theory and practice of the slug test for determining hydraulic conductivity in the field. Applying the slug test method to an aquifer saves time, and is considered inexpensive ...
  • Jamieson, Cristy (Faculty of Applied Science and Engineering, University of Regina, 2011-04-02)
    A Greenhouse Greywater Recycling System can reduce a home’s water consumption rate and provide a family with fresh produce year round. The greenhouse provides water treatment that meets Health Canada’s Water Quality ...
  • Li, Ting; Hampaul, Rahual (Faculty of Applied Science and Engineering, University of Regina, 2011-04-02)
    This project deals with the formation of disinfection by-products (DBP) in SK communities as a result of the post-chlorination technique used in water systems. The project includes the formulation of a cost equation, using ...
  • Soofi, Yasaman; Grewall, Holly; Gulbaek-Pearce, Tomesine (Faculty of Applied Science and Engineering, University of Regina, 2011-04-02)
    Legislation governing arsenic levels in Saskatchewan drinking water has recently become more stringent. Many communities are unable to meet these new standards and must upgrade their existing water treatment facilities. ...
  • Wang, Jing; Lin, Zirui; Xu, Chang (Faculty of Applied Science and Engineering, University of Regina, 2011-04-02)
    Microbial Fuel Cell (MFC) technology may be able to reduce energy consumption in wastewater treatment plants by generating electricity from the wastewater. Organic matter is removed by biological reactions during the ...
  • Wig, Dale; Demong, Justin (Faculty of Applied Science and Engineering, University of Regina, 2011-04-02)
    This study examines eight years of air pollution data, specifically Volatile Organic Compounds (VOC’s) obtained from a sampling site in downtown Regina, in order to determine if the contaminant levels are high enough to ...
  • Wu, Bo; Liao, Yang; Xiao, Yuting (Faculty of Applied Science and Engineering, University of Regina, 2011-04-02)
    This project presents a safe, efficient, and cost-effective design for the proposed junction of the West Regina Bypass and Highway #1. Several companies have located their facilities to a newly-developed Global Transportation ...

Search oURspace


Browse

My Account

About